The Valley Ridge 45th Anniversary Sale | Celebrate 45 Years With Savings Up to 50% | Shop the Sale

Pre-Bent S Curve Monorail — Brown

Regular price $511.88 CAD

Shipping

Outside New Brunswick, standard delivery is to your door (threshold delivery). If you have questions about delivery timeframes, upgrading to our white-glove delivery service, or anything else about our products, contact us so our team can confirm everything for you prior to purchase.

NB customers receive free White Glove Delivery from our in-house delivery team.

Please note that many of our products are "Special Order" and have varying lead times for delivery.

More detailed information can be found on our Shipping Policy page and our Returns & Refunds Policy page.

Product Description

MonoRail pre-bent into a horizontal S curve.

Product Details

  • Type
    Rail/Track
  • Style/type
    Contemporary Modern
  • Designer/Collection
    Pre-Bent
  • General Dimensions
    W: 0.30" × H: 0.60"
  • Specifications

  • Bulbs Included
    Yes
  • Dimensions

  • Width
    0.3"
  • Height
    0.60"

Limited Warranty

Furniture Warranty: We offer a one-year limited warranty covering manufacturing defects in materials and workmanship, effective from the date of delivery, unless otherwise specified, depending on the product.

Mattress Warranty: Our mattresses are covered by a 10-year limited warranty that protects against manufacturing defects.

Outdoor Furniture Warranty: The frames and structural components of outdoor furniture are covered for three years against defects. Outdoor fabrics have a one-year manufacturer's warranty.

Exclusions: Normal wear and tear, damage from improper use, exposure to extreme conditions, or modifications are not covered.

Our commitment: If you run into any issues with your product, whether next week or years from now, get in touch with our team and we'll make it right, including handling your warranty claim.

Email [email protected] or call 506-452-0100. Proof of purchase and photos may be required.

Payment & Security

  • American Express
  • Apple Pay
  • Diners Club
  • Discover
  • Google Pay
  • Mastercard
  • Shop Pay
  • Visa

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.


Layer Your Home With Inviting Textures & Distinctive Designs

The Camden Collection

  • Crafted exclusively for Valley Ridge Furniture, this collection offers timeless style, exceptional comfort, and lasting quality. Built with premium materials and expert craftsmanship, each piece is designed for durability and elegance.

    With cozy cushions, durable fabrics, and classic designs, the Camden Collection brings effortless beauty and unmatched comfort to your home.

0